• Sourcing Solutions
  • Services & Membership
  • Help & Community

Quick Details

  • Place of Origin: Hebei, China (Mainland)
  • Brand Name: Boyang
  • Model Number: aluminum formwork
  • Material: 6061-T6 Aluminum ALLOY
  • Bearing capacity: 60KN/m2
  • Weight: 25-30kg/m2
  • Hardness: about 13webster
  • Color: Silver
  • Application: construction concrete
  • Usage: Outdoor Formwork Systems
  • Certificate: ISO
  • Feature: Reuses about 300times
  • Surface: coated by isolation layer

Packaging & Delivery

Packaging Details Plastic films with wooden pallets or as customer's request
Delivery Time about 20 to 30 days

Introduction of Aluminum Template System

As a new template system, aluminum quick-release template system has an application history of nearly 50 years ever since the birth in U.S. in 1962 and has been widely applied in construction in developed countries like U.S. and Canada and newly rising industrial countries like Mexico, Brazil, Malaysia, ROK and India.

Products details
1. total system forms the complete concrete structure
2. convenient
3. easy operation
4. high quality
5. light and great flexibitity
6. durable, made of special alloy aluminum
7. no need for rehabilitation, no risk of rust and corrosion
8. fast installation owing to its special design
9. speed of construction-4-days each floor construction cycle.
10. Formwork can be re-used over 300 times.
11. No tower cranes required to lift the formwork from floor to floor, as the formwork is lightweight.

 

Main component:

 

System Characteristics
System Characteristicshigh standardization, lightweight, strong bearing capacity, high matching accuracy, disassembly convenience, large plate surface, less joints, good stability, long service life, more circulation times, recyclability, good economic benefits and high recovery value. 

 

In-plat Trial Assembly and Acceptance

 

In-plat Numbering,Disassembly,Packaging and Delivery to Site

 

 

Field Installation of Aluminum Template

 

Appearance Effects of Concrete after Template Removal

 

Analysis on Standard Five-day Construction Period
1) Day 1:Measure, lay off, bundle wall rebars and complete water and electricity performing and embedding
2) 07:00-12:00 in Day 2:Remove wall boards of lower level and transfer to the upper level for installation of wall column template
3) 14:00 in Day 2 - 18:00 in Day 3:Remove wall boards of lower level and transfer to the upper level for installation
4) 07:00-15:00 in Day 4:Bundle beam rebars, erect cantilevered structures for template construction, and adjust and strengthen wall column templates
5) 15:00 in Day 4 - 15:00 in Day 5:Bundle floor slab rebars and alternate water and electricity performing and embedding
6) 15:00-17:00 in Day 5:Clean the floor, recheck dimensions and prepare for concrete pouring
7) 17:00-23:00 in Day 5:Concrete pouring

 

our factory workshop

 

Our Service
• Your inquiry related to our product & price will be replied within 24hours.
• Well-trained & experienced staff are to answer all your inquiries professional in English of course.
• Working time: 8:30am - 6:00pm, Monday to Friday.
• OEM is highly welcomed. We have strong R&D team here to help.
• Your business relationship with us will be confidential to any third party.
• Good after-sale service offered, please get back if you got question

 

Transaction History of the Supplier

Below is the information about the supplier's transactions conducted via Alibaba.com. If you require further details regarding the transaction data, please contact the supplier directly.

Transaction Overview

Transactions

Transaction Details

This supplier has completedtransactions with buyers from .

Shipping Destination
Transaction Value
Transaction Date
Email to this supplier
China (Mainland) | Manufacturer, Trading Company
Supplier Assessments:
The supplier supports Trade Assurance – A free service that protects your orders from payment to delivery.
Supplier's Trade Assurance Limit: US $99,000
Learn More